Ebonyi-Califco Abakaliki Power Plant

Phase One – 10 .4 Mega Watt Dual Fuel (Diesel/Gas ) Fired Turbine Power Plant.

The Power plant consists of a 10 .4 Mega Watt Dual Fuel (Diesel/Gas ) fired turbine power plant comprising two 5.2 MW Taurus T60 XQ500, two 500,000 Liter Tank Farm and 33/11 KVA Substation Turbines on a 6.5 acre site for Abakaliki International Market and Ocho Udo City and 33/11 KVA Injection Substation.

Ref: Mr. Chukwuka, Director of
Engineering.
Ph. +1 234-803-7427115