Power Generation

The government of Ebonyi State retained, Califco (Nigeria) limited for the development of Electric Power Infrastructure for Ebonyi State. This project is an Engineering, Procurement and Construction (EPC) of a Dual Fuel ( Diesel/Natural Gas) Fired Turbine Power Plant. Califco Engineers, procured and installed two (2) Caterpillar XQ5200, 50 Hz Dual Fuel Fired Turbine Power Plant at Ocho Udo City in Abakiliki, Ebonyi State. The project included the design and construction of Two (2) 500,000 Litter Storage Tanks and Balance of Plants for the power plant.

Power Generation Services

Engineering, Procurement and Construction (EPC)
  • Project Planning
  • Site Selection
  • Conceptual Design
  • Preliminary Engineering
  • Final Engineering
  • Specifications
  • Procurement Services
  • Construction
  • Installation
  • Pre-commission Testing
  • Commissioning