Transportation Engineering – Project

Alameda Consolidated Freight Rail Corridor:

Project Manager for the City of Compton on Mid Corridor Segment of the Alameda Freight Rail Corridor In this capacity, we served as project managers and engineers for the mid-corridor segment of the Alameda Consolidated Freight Rail Corridor through the City of Compton with a construction cost of over $795 Million.

This project included a 60 feet wide by 32 feet deep trench that contained the consolidated freight railroad facilities that replaced several surface railroad lines within the corridor. It also included seven bridges at major arterial street east-west crossings and the replacement of most of the east-west utility lines throughout the corridor